Lot 1B

Lot 1B (suburban area) with the area of 24 hectares.
 
Power supply: A 110/10kW power substation with the reserve capacity of 14 MW is situated 200m away form the lot. There is a power line running along the lot. 20m-wide areas astride the power line constitute the sanitary protection zone.

Water supply: A water pipeline with the diameter of 150mm runs at the distance of 100m.

Sewer system:  Can be connected to the city system situated in 500m.

Drainage system: Trench system (to be approved by Mogilev Zonal Hygiene and Epidemiology Center).

Gas supply: A gas main runs across the lot. A gas control point is located directly in the lot.

Service roads: A railroad branch runs along the lot.

Land type: a mix of greenlands and croplands

According to the general plan of Mogilev city the lot is a part of the industrial area.

Fire safety: A fire depot for 4 fire-fighting vehicles is situated in the territory of «Plant «Mogilevtransmash», the affiliate of OJSC «МАZ», at the distance of 400m from the lot.