CJSC Joint Venture "Sopotex"

89 Grishina Street, Mogilev 212030 

Unfinished construction, spinning mill department

A single-storey building.

Dimensions: 110m (column spacing 12m)*108m (5 spans: 18m, 20m, and three of 24m) with the total area of 12 312 m2. Height: 7.2 m to the steel trusses underside.
Ferroconcrete framing with steel trusses, panel walls, profile steel roofing sheets. An engineering infrastructure is provided by “Sopotex”.
Construction suspended since 1994.

Note: Purchase

Layout