Режим для слабовидящих
info@fezmogilev.by

Land lots

“Mogilev” FEZ Useful information about free economic zone in Mogilev

Land lots

Land lot 4В with the area of 26.0 hectares.
Power supply
Is provided by a 110/10 kV substation “Industrialnaya” that is located near Novus Industry
Water supply
There is a combined circular water supply system for drinking water, 300 mm in diameter, technical water supply system (300 mm), sewage system (300mm), storm water drainage system (300-500 mm).
Heat supply
An overground heat supply network with diameter of 400 mm is available.
Gas supply
A high-pressure gas main, 500 mm in diameter, that belongs to a municipal gas supply facility runs along the lot.
Steam supply
There is a steam pipeline,133 mm in the diameter, and a condensate return pipeline.